Name of project/type of works | Percentage of works Completed | Contracting authority and place/Client | Type of Construction | Completion Date |
---|---|---|---|---|
MINISTRY OF BUDGET & NATIONAL PLANNING (EU): Construction of Basic Rural Infrastructure in the Nine Niger Delta States of Nigeria, LOT 8, Ondo State | Completed | Ministry of Budget & National Planning (EU) Plot 421 Constitution Avenue, Central Business District, Abuja. | Building and Water | 2020 |
KWARA STATE JOB: Supply and Installation, Testing and Commissioning of Kitchen Equipment for Department of Hotel, Catering and Hospitality Management | Completed | FEDERAL POLYTECHNIC OFFA Federal Polytechnic Offa, Kwara State. | Supply | 2019 |
EDO STATE JOB: Award of Contract for the construction of Gatehouse and Fencing Phase 1 | Completed | NATIONAL INSTITUTE FOR CONSTRUCTION TECHNOLOGY National Institute for Construction Technology, Uromi, Edo State | Building | 2016 |
EDO STATE JOB: The Construction of Major Industrial Boreholes and Water Distribution Networks at the Permanent Site of the National Institution of Construction Technology, Uromi. | Completed | NATIONAL INSTITUTE FOR CONSTRUCTION TECHNOLOGY National Institute for Construction Technology, Uromi, Edo State. | Water | 2015 |
OGUN STATE JOB: The Drilling and Reticulation of A 10-Panel Solar-Powered Boreholes in the Basement Formations of Osun, Oyo and Ogun States (Lot B6.4) | Completed | OGUN-OSUN RIVER BASIN DEVELOPMENT AUTHORITY Alabata Road, P.M.B 2115 Abeokuta, Ogun State. | Water | 2014 |
EDO STATE JOB: The Construction of 100 Units of 2 Bedroom Bungalow (Semi-Detached); 3 Bedroom Bungalow (Semi-Detached) and 4 Bedroom Bungalow (Detached) for Local Governments across Nigeria. | Completed | VICTORY RESORTS REALTORS LTD. Suite ‘O’ 43, 44, 51, & 52 Ikota Shopping Complex by V.G.C. Ikota, Lekki-Ajah, Lagos | Building | 2014 |
NASARAWA STATE JOB (TETFund PROJECT) The Construction of a Polygon-Shaped Two-Floors Twin Lecture Theatre. | Completed | THE FEDERAL POLYTECHNIC The Federal Polytechnic Nasarawa | Building | 2014 |
EDO STATE JOB: The Construction of a three Floors Male and Female Hostel Blocks A and B at the Permanent Site of the National Institution of Construction Technology, Uromi | Completed | NATIONAL INSTITUTE FOR CONSTRUCTION TECHNOLOGY National Institute For Construction Technology, Uromi,Edo State. | Building | 2015 |
ANAMBRA STATE JOB : The Construction of 194 Housing Units made up of; 38 Units of 4 Bedroom Detached Duplex, 44 Units of 4 Bedroom Semi-Detached Duplex Type A, 44 units of 4 Bedroom Semi-Detached Duplex Type B, 68 units of 3 Bedroom Terrace Duplex. | Completed | DANICENSOBI INT’L LTD. Plot 478 Umaru Diko Street, Jabi, Abuja | Building | 2015 |
KANO STATE PROJECT: Award of Contract for the Engineering Design for the Rehabilitation of Tamawa – Gulu Road at Rimi Gado Local Government Area in Kano State. Contract No: FMW/DPP/330/Vol. II/79 | Completed | ST. CHRISTOPHER’S CATHOLIC CHURCH Plot 1504, Cadastral Zone B11, Games Village, Abuja. | Building | 2015 |
OYO STATE CONTRACT: Award of Contract for the Engineering Design for the Rehabilitation of Access Road to Iresaadu -Igbo Aka -Oniphnu and Tewure -Ajinapa Road, Oyo State. Contract No: FMW/DPP/330/Vol. II/77. | Completed | FEDERAL MINISTRY OF WORKS Federal Ministry of Works, Mabushi, Abuja. | Design | 2015 |
ALIYU MAKAMA HOUSING ESTATE: The Completion of a total of 254 Housing units make up of 154 units of 2- Bedroom semi-Detached Houses and 100 units of 3- Bedroom Detached Bungalows. | Completed | NIGER STATE HOUSING CORPORATION Niger State Housing Corporation Niger State. | Building | 2012 |
ABAJI –FCT, ABUJA CONTRACT: Award of Contract for the Technical Evaluation of Burnt Bridges 1 (CH.57 + 450) Abuja –Abaji –Lokoja Road Section II: Sheda Village Junction to Abaji, FCT. Contract No: FMW/DPP/330/Vol.II/67. | Completed | FEDERAL MINISTRY OF WORKS Federal Ministry of Works, Mabushi, Abuja. | Consultancy | 2015 |
OGUN STATE JOB: Repairs of failed sections, reinstatement of eroded and construction of lined drain along Sango-Ota-Idiroko Road (CH.12 + 000 –CH.14 + 000) in Ogun State. | Completed | FEDERAL ROADS MAINTENANCE AGENCY (FERMA) (FERMA) No.163, Aminu Kano Crescent, Wuse II, Abuja. | Roads | 2013 |
LAGOS STATE JOB: Construction of Reinforced Concrete Lined Drain along Olodi-Apapa-Kirikiri Road and Delisting open lined drains (CH.0 + 644 –CH.3 + 380 L.H.S.) within Lagos West, Lagos State | Completed | FEDERAL ROADS MAINTENANCE AGENCY (FERMA) (FERMA) No.163, Aminu Kano Crescent, Wuse II, Abuja. | Roads | 2013 |